Sunday, April 15, 2012

Notes from the April 14th meeting


April 14, 2012, Weather Balloon Meeting Notes

·         A YouTube video link has been sent to teachers to show in class.
·         We have three tanks of helium: one for the dress rehearsal and two for launch day. Each balloon needs one tank.
·         We need to start blowing up the two balloons 1 hour, 15 minutes before launch. It will take approximately 20 minutes per balloon. We’ll need a couple of regulators to inflate both balloons simultaneously. While inflating, the payloads should be readied.
·         The Peace Assembly starts at 9 a.m. At 9:30 the students will go outside and form a giant peace symbol. The balloons will launch at 9:45 a.m.
·         Rain dates: Peace Walk day or Track and Field Day.
·         The on-board cameras have 2.5 hours video capacity. They can shoot a 127° to 170° view. The untethered balloon payload cameras will be mounted with one pointing down, the other out one side.
·         The tethered balloon will also have a camera, pointing down.
·         Payload can be 2 to 5 pounds.
·         The traveling balloon will have 2 GPS for tracking. The recovery team will have a trailer full of equipment to aid in recovery. While a tricked-out ATV is coveted, the budget can’t sustain such an expense  :-)
·         Two teams will be needed: HQ and Recovery. The HQ team will monitor the tethered balloon and GPS tracking. The recovery team will have 2 vehicles. We will lose contact with the traveling balloon on the way up at 60,000 feet and will not reconnect until it has fallen back down to 20,000 feet. Models indicate that the balloon could land in an area from Taylor Falls to Eau Claire to Rochester. However, we are the whim of the winds.
·         Each classroom will make a prediction about where the balloon will land. A pin with each teacher’s name will be placed on a map.
·         Each kid on the balloon team may launch a small, colorful helium balloon during the launch.
·         PR? Sheila noted that it is being handled.
·         Saturday, April 28, will be a full dress rehearsal (inflate, tether, payload/equipment test). We’ll start at 8 a.m.
·         During the actual flight, real-time tracking can be done via Google Maps or a Facebook page that Sheila is working on.
·         Updates for the students could happen throughout the day on the Bel Air News. Perhaps the HQ team can handle this?
·         Matthew had a brainstorm: Perhaps we could use a food-saver vacuum system to seal and protect the cameras from condensation and/or a water landing. Applause followed and the meeting ended.

No comments:

Post a Comment